Further Production Process:
1. Equipment: Laser Cutting Machine, Bending Machine, Punching, Nibbling Machine, Press Machine, CNC, Lathe machine, Milling machine, Drilling machine, Grinding machine, and so on;
2. Heat Treatment: annealing , carbonization, tempering, quench, normalization and surface tempering
3. Surface treatment: Powder coating, Anodization, Chrome plating, Painting, Sand blasting, Nickel Plating, Zinc Plating, Blacking, Polishing, Bluing, etc.
Tooling & Mould:
1. Mould life: usually semi-permanent.
2. Tooling Leadtime: 15-25 days, depending on the structure and size.
3. Tooling & mould maintenance: Be responsible by Evergreen Machinery.
Quality control:
1. Quality control: The defective products rate is less 0.1%.
2. Sample and pilot run will be given 100% inspection during production and before shipment, Sample check for mass production according to ISDO standard or customer requirements
3. Test equipment: Spectrum Analyzer, CMM, Hardness test equipment, Tension test machine;
4. After-sales services are available.
5. Quality situation can be traceable.
Application:
1. Engine parts,
2. Auto parts,
3. Machinery Parts,
4. Rail Train parts,
5. Truck Parts,
6. Tractor Parts
7. Construction Equipment
8. Agriculture Equipment,
9. Other industrial fields.
– Carbon Steel: 10#, 15#, 20#, 25#, 30#, 35#, 40#, 45#, 50#, 55#…etc.
– Alloy Steel: 15Mn, 16Mn, 40Cr, 42CrMo…and other alloy steel.
– Stainless Steel: SUS304, SUS316, SUS316L, etc
– Aluminum: 6061 T6, 6063 T6
1. OEM & ODM both accepted. Products can be designed and produced as per customer’s requirements in forms of Samples, Drawings or even just a draft idea.
2. Over 20 years of experience in casting, welding, forging and precision machining for US, European and other overseas markets.
3. Leadtime (Negotiable) :
– For toolings: around 15-35 days.
– For samples: 7- 15 days.
– For batch production: 25 days.
4. Payment terms (Negotiable):
– For toolings: 100% pre-payment before development.
– For samples: For free unless the sample(s) value is too big.
– For mass production: 30% down payment before production (and after samples approval), balance 70% before delivery.
5. Package: Carton Box, PlyWood Box, Standard Export Pallets or as per customers’ requirements.
6. Shipping terms: EXW, FOB, CFR, CIF, DDP, DDU…all could be accepted.